GABBRO SUPPORT SERVICES AREA (GSSA) & LIGHT INDUSTRIAL
AREA (LIA) – INFRASTRUCTURE WORKS
This Project includes EPIC for the Earthworks, involving mainly earthworks filling of low-lying Sabkha area up to formation level which is +2.0 m QNHD, at GSSA and LIA and also include for the EPIC of the road network, sewerage, and other infrastructures for GSSA and LIA.
Scope of works consists of construction of a road network with all associated serviced, construction of foul sewerage network including a major pumping station and rising mains, construction of the surface water network and construction of certain utility services network, dry legs and duct crossing.